Sample website. Brannock Metalworks is a fictional company.Designed by Mouhamed Saad · want one for your shop?
Request a quote
Custom metal fabrication

Cut, formed, welded and coated, under one roof.

One-off prototypes to repeat production runs: fiber laser cutting, press brake forming, certified welding and powder coat. Your parts come back finished instead of bouncing between four vendors.

12 kWfiber laser, 5 × 10 ft bed
AWS D1.1certified welders
3–5 daystypical lead time
300.0180.06FILLET, BOTH SIDESDWG B-2207 3/8" A36WELD PER AWS D1.1
Gusseted bracket, A36Lot of 400 · powder coated
Capabilities

What we make, and how.

The first thing a buyer checks is whether you can make the part. Every process here links to the machines that run it.

Fiber laser cutting

Clean edges on steel, stainless and aluminum, nested to cut your material cost.

Up to 1 in mild steel · 5 × 10 ft sheets

Press brake forming

CNC back-gauged bending that repeats part to part, run after run.

220 ton · 13 ft bed · ±0.5°

MIG & TIG welding

Certified welders on steel, stainless and aluminum, from brackets to full frames.

AWS D1.1 / D1.2 / D1.6

Robotic welding

Consistent welds and a lower cost per part once you're into production volumes.

Two-station cell

Powder coating

In-house finish in hundreds of colors, cured and inspected before it leaves.

Oven 8 × 8 × 20 ft

Hardware & assembly

PEM hardware, sub-assembly and kitting, shipped ready for your line.

Kanban and blanket orders
Equipment list

The machines behind the quote.

Engineers want to see the equipment before they send a drawing. Here it is, with the work envelope of each machine.

MachineProcessCapacityQty
Trumpf TruLaser 3040Fiber laser, 12 kW157 × 79 in bed1
Amada HG 2204Press brake220 t · 13 ft1
Accurpress 7606Press brake60 t · 6 ft1
Fanuc ARC Mate 100iDRobotic weld cellTwo stations1
Miller Dynasty 400TIGAC / DC4
Lincoln Power MIG 360MPMIG, multi-process360 A6
Mild steel A36Stainless 304 / 316Aluminum 5052 / 6061GalvanizedTube, angle and channelExpanded metal & grating
Quality

Certified, inspected, documented.

Every order is checked against the print before it's welded and again before it's coated. If a part is wrong, you hear it from us first.

AWS D1.1 certified weldersISO 9001:2015First-article inspectionMaterial traceabilityWeld maps on request
Industries

Who we make parts for.

Most of our work is repeat business from OEMs in these industries.

AgricultureConstructionFood processingEnergyArchitecturalMaterial handling
Request a quote

Send your drawing. We'll quote it within one business day.

  • DXF, DWG, STEP, or a PDF sketch is enough
  • Tell us the quantities: we price prototypes and production
  • Not sure it can be made? Ask anyway